Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Shield recovery in water-rich sand strata is a challenging issue in the field of shield tunnel engineering, especially when the end of the shaft cannot be reinforced by jet grouting or freezing or when the shield cannot be supported with a steel sleeve. Therefore, it is important to develop an effec...
Saved in:
Main Authors: | Weiqiang Qi, Zhiyong Yang, Yusheng Jiang, Zhiyong Liu, Yinxin Guo, Xing Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/6049608 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Phenomenon and Critical Conditions of Chamber Soil Sliming during EPB Shield Tunneling in Water-Rich Weathered Diorite: Case Study of Jinan Metro, China
by: Lu Wang, et al.
Published: (2020-01-01) -
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China
by: Zhiyong Yang, et al.
Published: (2020-01-01) -
Tel-Aviv a cent ans ! 1909-2009 : un siècle de globalisation au Proche-Orient
by: Caroline Rozenholc
Published: (2009-03-01) -
Oral health disparities in early childhood and intergenerational gaps among noncitizen migrants, Arabs, and Jews in South Tel Aviv, Israel
by: Jonathan Brill, et al.
Published: (2025-01-01) -
Structural Monitoring of Metro Infrastructure during Shield Tunneling Construction
by: L. Ran, et al.
Published: (2014-01-01)