Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv

Shield recovery in water-rich sand strata is a challenging issue in the field of shield tunnel engineering, especially when the end of the shaft cannot be reinforced by jet grouting or freezing or when the shield cannot be supported with a steel sleeve. Therefore, it is important to develop an effec...

Full description

Saved in:
Bibliographic Details
Main Authors: Weiqiang Qi, Zhiyong Yang, Yusheng Jiang, Zhiyong Liu, Yinxin Guo, Xing Yang
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/6049608
Tags: Add Tag
No Tags, Be the first to tag this record!