Primary Current Test Method for Transformer Protection Based on Transient Load

When test load is insufficient, the current transformer (TA) secondary circuit test by primary current cannot be completed, which often results in the failure of new transformer protection to be put into normal operation. In order to solve this problem, a method for testing TA secondary circuit by u...

Full description

Saved in:
Bibliographic Details
Main Author: Jiyin SHI
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2021-05-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202007025
Tags: Add Tag
No Tags, Be the first to tag this record!