A case study on the stability of a big underground powerhouse cavern cut by an interlayer shear zone in the China Baihetan hydropower plant
Abstract The big underground powerhouse cavern of the China Baihetan hydropower plant is 438 m long, 34 m wide, and 88.7 m high. It is cut by a weak interlayer shear zone and its high sidewall poses a huge stability problem. This paper reports our successful solution of this problem through numerica...