Construction and Repair of Water Wells with Circulation Regeneration System
The paper considers a new design of a water well with an integrated circulation and reactant regeneration system. Water well drilling technique, its maintenance and modernization have been given in the paper. The paper presents expressions for calculation of static heave while extracting a filter an...
Saved in:
Main Authors: | I. I. Ivashechkin, P. A. Avtushko |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2011-08-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/277 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Investigation of Steady Fluid Flow in Pre-Screen Zone of Well During Its Regeneration while Using Tube Post-Filter Flushing
by: V. V. Ivashechkin, et al.
Published: (2013-10-01) -
DESIGN DEVELOPMENT OF THE WATER SUPPLY WELLS AND METHODS OF THEIR CAPITAL REPAIR
by: V. V. Ivashechkin
Published: (2016-03-01) -
Determination оf Optimum Constructive Parameters for Circulating-Reagent Regeneration Sector Apparatus
by: A. M. Sheiko, et al.
Published: (2008-02-01) -
Experimental Investigations of Well Equipped with Annulus System of Reagent Flushing
by: V. V. Ivashechkin, et al.
Published: (2011-02-01) -
CALCULATION OF TECHNOLOGICAL PARAMETERS OF OUT-PIPE REAGENT CIRCULAR IRRIGATION OF GRAVEL-PACKED FILTERS OF WATER SUPPLY WELLS
by: V. V. Ivashechkin, et al.
Published: (2014-12-01)