System Hazard Analysis of Tower Crane in Different Phases on Construction Site
Tower crane accidents frequently occur in the construction industry, often resulting in casualties. The utilization of tower cranes involves multiple phases including installation, usage, climbing, and dismantling. Moreover, the hazards associated with the use of tower cranes can change and be propa...
Saved in:
| Main Authors: | Ling Jiang, Tingsheng Zhao, Wei Zhang, Junjie Hu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/7026789 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
RESEARCH OF THE MOBILE TOWER CRANE TOWER DOWN FOUR-BAR LINKAGE
by: SHANGGUAN JianLin, et al.
Published: (2016-01-01) -
Stress Measurement and Analysis of Structural Parameters of Flat Arm Tower Crane Under Different Working Conditions
by: Qinghua Zhang, et al.
Published: (2025-03-01) -
Reducing Safety Risks in Construction Tower Crane Operations: A Dynamic Path Planning Model
by: Binqing Cai, et al.
Published: (2024-11-01) -
Impact of Multiple Operating Parameters Interactions on Load Swing of Tower Cranes
by: Peijin Liu, et al.
Published: (2025-01-01) -
Tower Crane Layout Planning: Multi-Optimal Solutions Algorithm
by: Xiaokang Huang, et al.
Published: (2024-11-01)