Problem Analysis of Asaoka Method on the Post-construction Settlement Prediction of Soft Ground

In view of uncertainty of Asaoka method on the post-construction settlement prediction of soft ground,this paper transforms the measured data at constant time interval through BP neural network with good nonlinear fitting ability,establishes the regression analysis model at different starting points...

Full description

Saved in:
Bibliographic Details
Main Authors: ZHOU Yuelei, LIU Zhonghan
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2020-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.08.014
Tags: Add Tag
No Tags, Be the first to tag this record!