Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling
ABSTRACT This study introduces a new approach by applying the Whale Optimization Algorithm (WOA) to create construction schedules using geometric data from Building Information Modeling (BIM). The algorithm utilizes 3D model information to establish stability criteria, which are organized in a Direc...
Saved in:
| Main Authors: | S. M. Golmaei, J. Vahidi, Morteza Jamshidi |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2025-03-01
|
| Series: | Engineering Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1002/eng2.70022 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quality and reliability of IFC/BIM models for public educational facilities construction projects via clash detection
by: Michał Juszczyk, et al.
Published: (2025-01-01) -
Construction Scheduling Optimization of Prefabricated Buildings Under Resource Constraints Based on an Improved Whale Optimization Algorithm
by: Rui Su, et al.
Published: (2025-07-01) -
BIM-Based Model Checking: A Scientometric Analysis and Critical Review
by: Sihao Li, et al.
Published: (2024-12-01) -
MDGAIN-IFC: An intelligent construction method for full/refined benchmark dataset of postpartum hemorrhage based on MDGAIN and information fidelity
by: Xiaodan Li, et al.
Published: (2025-09-01) -
Graph Database Modelling on Malay Architecture IFC Data
by: Muhammad Ariful Furqon, et al.
Published: (2021-06-01)