Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling
ABSTRACT This study introduces a new approach by applying the Whale Optimization Algorithm (WOA) to create construction schedules using geometric data from Building Information Modeling (BIM). The algorithm utilizes 3D model information to establish stability criteria, which are organized in a Direc...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2025-03-01
|
| Series: | Engineering Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1002/eng2.70022 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|