Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model

As a typical extreme environment, a high-geothermal environment poses severe challenges to tunnel construction in western China. In this paper, a thermal–mechanical coupling model was formulated to evaluate the cracking behavior of lining under high-geothermal conditions, considering the early prope...

Full description

Saved in:
Bibliographic Details
Main Authors: Si Xie, Dan Zhao, Peng Yi, Qian Chen, Wei Liu
Format: Article
Language:English
Published: MDPI AG 2025-01-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/15/2/301
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832588871267778560
author Si Xie
Dan Zhao
Peng Yi
Qian Chen
Wei Liu
author_facet Si Xie
Dan Zhao
Peng Yi
Qian Chen
Wei Liu
author_sort Si Xie
collection DOAJ
description As a typical extreme environment, a high-geothermal environment poses severe challenges to tunnel construction in western China. In this paper, a thermal–mechanical coupling model was formulated to evaluate the cracking behavior of lining under high-geothermal conditions, considering the early property evolution of concrete. This was further validated by field monitoring and analyzed by adjusting the relevant parameters. Results indicate that the higher cracking risk occurred on the external surface of the lining sidewall after 24 h of casting. With the increase in surrounding rock temperature, the duration of cracking risk in the lining was extended. When the surrounding rock temperature exceeded 68.7 °C, thermal insulation measures were required for the lining structure. Notably, superior thermal insulation was achieved by applying a sandwich structure of rigid polyurethane materials with a thickness of 20–60 mm. In terms of curing conditions, adopting formwork with a larger heat convection coefficient was conducive to reducing the cracking risk of the tunnel lining, with an appropriate removal time of 48 h. This work provides insights into the thermal–mechanical behavior of lining concrete, thereby mitigating its early cracking in a high-geothermal environment.
format Article
id doaj-art-eaa73e45a2db40dfa2a907d40494f827
institution Kabale University
issn 2075-5309
language English
publishDate 2025-01-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj-art-eaa73e45a2db40dfa2a907d40494f8272025-01-24T13:26:32ZengMDPI AGBuildings2075-53092025-01-0115230110.3390/buildings15020301Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling ModelSi Xie0Dan Zhao1Peng Yi2Qian Chen3Wei Liu4State Key Laboratory of Intelligent Geotechnics and Tunnelling, China Railway First Survey and Design Institute Group Co., Ltd., Xi’an 710043, ChinaShenzhen Municipal Design and Research Institute Co., Ltd., Shenzhen 518029, ChinaState Key Laboratory of Intelligent Geotechnics and Tunnelling & National Engineering Research Center of Deep Shaft Construction, Shenzhen University, Shenzhen 518060, ChinaState Key Laboratory of Intelligent Geotechnics and Tunnelling & National Engineering Research Center of Deep Shaft Construction, Shenzhen University, Shenzhen 518060, ChinaState Key Laboratory of Intelligent Geotechnics and Tunnelling & National Engineering Research Center of Deep Shaft Construction, Shenzhen University, Shenzhen 518060, ChinaAs a typical extreme environment, a high-geothermal environment poses severe challenges to tunnel construction in western China. In this paper, a thermal–mechanical coupling model was formulated to evaluate the cracking behavior of lining under high-geothermal conditions, considering the early property evolution of concrete. This was further validated by field monitoring and analyzed by adjusting the relevant parameters. Results indicate that the higher cracking risk occurred on the external surface of the lining sidewall after 24 h of casting. With the increase in surrounding rock temperature, the duration of cracking risk in the lining was extended. When the surrounding rock temperature exceeded 68.7 °C, thermal insulation measures were required for the lining structure. Notably, superior thermal insulation was achieved by applying a sandwich structure of rigid polyurethane materials with a thickness of 20–60 mm. In terms of curing conditions, adopting formwork with a larger heat convection coefficient was conducive to reducing the cracking risk of the tunnel lining, with an appropriate removal time of 48 h. This work provides insights into the thermal–mechanical behavior of lining concrete, thereby mitigating its early cracking in a high-geothermal environment.https://www.mdpi.com/2075-5309/15/2/301high-geothermallining concretethermal–mechanical coupling modelsurrounding rock temperaturethermal insulation layercuring condition
spellingShingle Si Xie
Dan Zhao
Peng Yi
Qian Chen
Wei Liu
Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model
Buildings
high-geothermal
lining concrete
thermal–mechanical coupling model
surrounding rock temperature
thermal insulation layer
curing condition
title Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model
title_full Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model
title_fullStr Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model
title_full_unstemmed Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model
title_short Investigation into the Early Cracking Behavior of High-Geothermal Tunnel Lining Concrete Based on Thermal–Mechanical Coupling Model
title_sort investigation into the early cracking behavior of high geothermal tunnel lining concrete based on thermal mechanical coupling model
topic high-geothermal
lining concrete
thermal–mechanical coupling model
surrounding rock temperature
thermal insulation layer
curing condition
url https://www.mdpi.com/2075-5309/15/2/301
work_keys_str_mv AT sixie investigationintotheearlycrackingbehaviorofhighgeothermaltunnelliningconcretebasedonthermalmechanicalcouplingmodel
AT danzhao investigationintotheearlycrackingbehaviorofhighgeothermaltunnelliningconcretebasedonthermalmechanicalcouplingmodel
AT pengyi investigationintotheearlycrackingbehaviorofhighgeothermaltunnelliningconcretebasedonthermalmechanicalcouplingmodel
AT qianchen investigationintotheearlycrackingbehaviorofhighgeothermaltunnelliningconcretebasedonthermalmechanicalcouplingmodel
AT weiliu investigationintotheearlycrackingbehaviorofhighgeothermaltunnelliningconcretebasedonthermalmechanicalcouplingmodel