Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”

Saved in:
Bibliographic Details
Main Authors: Heng Li, Enlin Ma, Jinxing Lai, Lixin Wang, Shuoshuo Xu, Ke Wang, Tong Liu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/5694569
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832559730594152448
author Heng Li
Enlin Ma
Jinxing Lai
Lixin Wang
Shuoshuo Xu
Ke Wang
Tong Liu
author_facet Heng Li
Enlin Ma
Jinxing Lai
Lixin Wang
Shuoshuo Xu
Ke Wang
Tong Liu
author_sort Heng Li
collection DOAJ
format Article
id doaj-art-e7aa554891c942b0896bd269e644874d
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-e7aa554891c942b0896bd269e644874d2025-02-03T01:29:22ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/56945695694569Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”Heng Li0Enlin Ma1Jinxing Lai2Lixin Wang3Shuoshuo Xu4Ke Wang5Tong Liu6School of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaInstitute of Geotechnical Engineering, Xi’an University of Technology, Xi’an 710043, ChinaSchool of Science, Xi’an University of Architecture and Technology, Xi’an 710055, Chinahttp://dx.doi.org/10.1155/2021/5694569
spellingShingle Heng Li
Enlin Ma
Jinxing Lai
Lixin Wang
Shuoshuo Xu
Ke Wang
Tong Liu
Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
Advances in Civil Engineering
title Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
title_full Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
title_fullStr Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
title_full_unstemmed Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
title_short Corrigendum to “Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an”
title_sort corrigendum to tunnelling induced settlement and treatment techniques for a loess metro in xi an
url http://dx.doi.org/10.1155/2021/5694569
work_keys_str_mv AT hengli corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian
AT enlinma corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian
AT jinxinglai corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian
AT lixinwang corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian
AT shuoshuoxu corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian
AT kewang corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian
AT tongliu corrigendumtotunnellinginducedsettlementandtreatmenttechniquesforaloessmetroinxian