Sensitivity of Maximum Current Protection in the case of 6-10 kV Air Power Line Back

The paper contains results of the investigations that reveal the possibility of mutual back-up of 6-lOkV air power lines in the case of emergency power supply switching of any line on condition that operation of the current protection system is initiated. The air power lines of the Gomel power netwo...

Full description

Saved in:
Bibliographic Details
Main Authors: G. F. Kutsenko, A. A. Parfenov
Format: Article
Language:Russian
Published: Belarusian National Technical University 2003-12-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Online Access:https://energy.bntu.by/jour/article/view/1292
Tags: Add Tag
No Tags, Be the first to tag this record!