Experience of Introduction and Operation of Automatic Control Systems of Thyristor Drives in Electrical Part of Steam-Gas Plant Power Block at Station No. 4, Berezovskaya Hydraulic Power Station
The paper describes automatic system for controlling the equipment of electrical part of 165 MW which is based on programming controllers and computers.The proposed system can be applied at operating power stations and the stations which are under construction.The paper provides results showing intr...
Saved in:
Main Authors: | I. V. Senyagine, M. M. Naletsky, Е. N. Zyl, S. V. Kochura |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2007-02-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/639 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Higher Efficiency and Temperature Reliability of Steam Generators at Thermal Power Stations
by: R. F. Kelbaliev, et al.
Published: (2010-08-01) -
Experience of Steam and Gas Unit Running-In at the Orsha Thermal Power Station
by: A. D. Kachan, et al.
Published: (2004-02-01) -
Automatic Analysis of Operational Failures of Electric Power Station Equipment – Efficient Method for Reduction in Expenditure for Power Generation
by: V. A. Yanitsky
Published: (2008-08-01) -
DEVELOPMENT OF COMPUTER MODEL AND INVESTIGATION OF HYDRAULIC OPERATIONAL MODES OF CIRCULATING SYSTEMS AT VAZ THERMAL POWER STATION
by: V. V. Dikop, et al.
Published: (2005-06-01) -
Four-Phase Power Transmission in the Power Output Scheme of Electric Power Station
by: S. V. Kuzmitch
Published: (2007-02-01)