Experience of Introduction and Operation of Automatic Control Systems of Thyristor Drives in Electrical Part of Steam-Gas Plant Power Block at Station No. 4, Berezovskaya Hydraulic Power Station
The paper describes automatic system for controlling the equipment of electrical part of 165 MW which is based on programming controllers and computers.The proposed system can be applied at operating power stations and the stations which are under construction.The paper provides results showing intr...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2007-02-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/639 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|