Construction and Control of Earth Filling for Auxiliary Dam of Baise Project
Saved in:
| Main Authors: | WANG Lang, DONG Ze-ping |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2006-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47667407&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
RCC Main Dam of Baise Project under Construction
by: HE Shao-run
Published: (2006-01-01) -
Arrangement of Observation Installation for the Dam of Baise Project and Preliminary Measurement Results
by: CHEN Shun-tian, et al.
Published: (2006-01-01) -
Progress in Baise Water Project Construction
Published: (2006-01-01) -
Quality Supervision for Construction of Power Plant Tender of Baise Project
by: XIANG Fei
Published: (2006-01-01) -
Analysis of the Barring of Unit 4 of Baise Project
by: LUO Hong-yun, et al.
Published: (2006-01-01)