Layout of Release Works and Design of Revetment of Lagdo Hydropower Station

The Lagdo Hydropower Station has a storage volume of 8.69 billion m3 and an installed capacity of 72 MW. The clay core rockfill dam is 40m high with its release works consisting of a spillway and a release outlet. The release outlet is arranged on the right bank of the main dam and is a free-flow tu...

Full description

Saved in:
Bibliographic Details
Main Author: WANG Yi-zhui
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2001-01-01
Series:Renmin Zhujiang
Online Access:http://www.renminzhujiang.cn/thesisDetails?columnId=47672667&Fpath=home&index=0
Tags: Add Tag
No Tags, Be the first to tag this record!