Hydrodynamic Numerical Simulation of the Sipaikou Reach of the Yellow River in Ningxia Based on MIKE 3

In order to study the flow of the 4.530 km reach under the influence of the spur dikesafter the Sipaikoureach of the Yellow River in Ningxia runs under the “curve cut-off” project,and provide decision-making references and suggestions for the safe and stable operation of theproject,aiming at the uni...

Full description

Saved in:
Bibliographic Details
Main Authors: LIU Xin, LI Chunguang, LAN Bin, HUANG Chuanji, HE Jinsha
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2020-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.07.005
Tags: Add Tag
No Tags, Be the first to tag this record!