Linear Control Method for Arch Ring of Oblique-Stayed Buckle Cantilever Pouring Reinforced Concrete Arch Bridge

Yelang Lake Bridge is the largest cantilevered single-chamber reinforced concrete arch bridge in China, with a net span of 210 m. In this article, an equation for positioning the height of the formwork before pouring of the arch ring segment was derived, which was suitable for the construction contr...

Full description

Saved in:
Bibliographic Details
Main Authors: Zengwu Liu, Jianting Zhou, Yuexing Wu, Xing You, Yinghao Qu
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6633717
Tags: Add Tag
No Tags, Be the first to tag this record!