Optimization of Asynchronous Electric Generator Parameters in System Wind Power Installations
The paper considers a wind power installation with asynchronous electric generator which is integrated in large power system. Mathematical model describing a wind motor, an asynchronous generator, step-up transformers, cable and open-air electric power lines has been used to obtain linear polynomial...
Saved in:
Main Author: | Yu. V. Makosko |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2004-12-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/1182 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
SIMULATION OF QUASI-STATIONARY OPERATIONAL CONDITIONS OF INDUCTION GENERATOR OF WIND- ENERGY SYSTEM INSTALLATION
by: M. M. Oleshkevich, et al.
Published: (2003-06-01) -
Higher Reliability of Electric Power Supply under Wind Electrical Installation Operation in General Power System by Optimization of Their Scheduled Control Period
by: Y. A. Rolik, et al.
Published: (2010-06-01) -
CONTROL OPTIMIZATION OF WIND UNIT WITH HELICOID VERTICALLY AXIAL WINDMILL AND SYNCHRONOUS MAGNETO-ELECTRIC GENERATOR
by: М. М. Oleshkevich, et al.
Published: (2005-06-01) -
Forecasting Chinese Wind Power Installed Capacity Using a Novel Grey Model with Parameters Combination Optimization
by: Xiaoshuang Luo, et al.
Published: (2021-01-01) -
Model for Investigation of Operational Wind Power Plant Regimes with Doubly–Fed Asynchronous Machine in Power System
by: R. I. Mustafayev, et al.
Published: (2012-06-01)