Intelligent Optimization Scheduling Strategy for Energy Consumption Reduction for Equipment in Open-Pit Mines Based on Enhanced Genetic Algorithm
To achieve a rational allocation of real-time operational equipment, such as excavators and dump trucks, in open-pit mines, and thereby enhance truck–shovel coordination, this paper addresses the challenges posed by unreasonable on-site scheduling, which includes excessive truck waiting times and pr...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-12-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/18/1/60 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|