Methods to reduce risk in implementing investment projects in nuclear power plants
The main tasks ofthe Russian energy industry are considered, the specific features ofquality management to reduce risks of nuclear power plants are analyzed, methods to account for risk when calculating the efficiency of investment projects are suggested.
Saved in:
| Format: | Article |
|---|---|
| Language: | Russian |
| Published: |
Russian Academy of Entrepreneurship
2020-01-01
|
| Series: | Путеводитель предпринимателя |
| Subjects: | |
| Online Access: | https://www.pp-mag.ru/jour/article/view/662 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Importance of Probabilistic Safety Assessment in the Careful Study of Risks Envolved to New Nuclear Power Plant Projects
by: Jônatas Franco Campos da Mata, et al.
Published: (2021-07-01) -
A Review of the Evaluation, Simulation, and Control of the Air Conditioning System in a Nuclear Power Plant
by: Seyed Majid Bigonah Ghalehsari, et al.
Published: (2025-03-01) -
An Intervention Study of Employee Safety Behavior in Nuclear Power Plants Under Construction Based on the SEM-SD Model
by: Jianzhan Gao, et al.
Published: (2025-03-01) -
Synchronous collaborative application of nuclear power engineering design platform
by: Zhihua ZENG, et al.
Published: (2017-05-01) -
Synchronous collaborative application of nuclear power engineering design platform
by: Zhihua ZENG, et al.
Published: (2017-05-01)