An Improved Effective Cost Review Process for Value Engineering

Second-look value engineering (VE) is an approach that aims to lower the costs of products for which target costs are not being met during the production stage. Participants in second-look VE typically come up with a variety of ideas for cost cutting, but the outcomes often depend on their levels of...

Full description

Saved in:
Bibliographic Details
Main Authors: D. S. Joo, J. I. Park
Format: Article
Language:English
Published: Wiley 2014-01-01
Series:The Scientific World Journal
Online Access:http://dx.doi.org/10.1155/2014/682051
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832556410417709056
author D. S. Joo
J. I. Park
author_facet D. S. Joo
J. I. Park
author_sort D. S. Joo
collection DOAJ
description Second-look value engineering (VE) is an approach that aims to lower the costs of products for which target costs are not being met during the production stage. Participants in second-look VE typically come up with a variety of ideas for cost cutting, but the outcomes often depend on their levels of experience, and not many good alternatives are available during the production stage. Nonetheless, good ideas have been consistently generated by VE experts. This paper investigates past second-look VE cases and the thinking processes of VE experts and proposes a cost review process as a systematic means of investigating cost-cutting ideas. This cost review process includes the use of an idea checklist and a specification review process. In addition to presenting the process, this paper reports on its feasibility, based on its introduction into a VE training course as part of a pilot study. The results indicate that the cost review process is effective in generating ideas for later analysis.
format Article
id doaj-art-c85bc67f43384ed7be868b2d34c7b6bc
institution Kabale University
issn 2356-6140
1537-744X
language English
publishDate 2014-01-01
publisher Wiley
record_format Article
series The Scientific World Journal
spelling doaj-art-c85bc67f43384ed7be868b2d34c7b6bc2025-02-03T05:45:33ZengWileyThe Scientific World Journal2356-61401537-744X2014-01-01201410.1155/2014/682051682051An Improved Effective Cost Review Process for Value EngineeringD. S. Joo0J. I. Park1Department of Industrial Engineering, Ajou University, San 5, Woncheon-dong, Yeongtong-gu, Suwon 443-749, Republic of KoreaDepartment of Industrial Engineering, Ajou University, San 5, Woncheon-dong, Yeongtong-gu, Suwon 443-749, Republic of KoreaSecond-look value engineering (VE) is an approach that aims to lower the costs of products for which target costs are not being met during the production stage. Participants in second-look VE typically come up with a variety of ideas for cost cutting, but the outcomes often depend on their levels of experience, and not many good alternatives are available during the production stage. Nonetheless, good ideas have been consistently generated by VE experts. This paper investigates past second-look VE cases and the thinking processes of VE experts and proposes a cost review process as a systematic means of investigating cost-cutting ideas. This cost review process includes the use of an idea checklist and a specification review process. In addition to presenting the process, this paper reports on its feasibility, based on its introduction into a VE training course as part of a pilot study. The results indicate that the cost review process is effective in generating ideas for later analysis.http://dx.doi.org/10.1155/2014/682051
spellingShingle D. S. Joo
J. I. Park
An Improved Effective Cost Review Process for Value Engineering
The Scientific World Journal
title An Improved Effective Cost Review Process for Value Engineering
title_full An Improved Effective Cost Review Process for Value Engineering
title_fullStr An Improved Effective Cost Review Process for Value Engineering
title_full_unstemmed An Improved Effective Cost Review Process for Value Engineering
title_short An Improved Effective Cost Review Process for Value Engineering
title_sort improved effective cost review process for value engineering
url http://dx.doi.org/10.1155/2014/682051
work_keys_str_mv AT dsjoo animprovedeffectivecostreviewprocessforvalueengineering
AT jipark animprovedeffectivecostreviewprocessforvalueengineering
AT dsjoo improvedeffectivecostreviewprocessforvalueengineering
AT jipark improvedeffectivecostreviewprocessforvalueengineering