Correction: Analyzing cost impacts across the entire process of prefabricated building components from design to application
Saved in:
| Main Authors: | Lin Liu, Hsing-Wei Tai, Teng Wang, Liang Qiao, Kuo-Tai Cheng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2025-05-01
|
| Series: | Scientific Reports |
| Online Access: | https://doi.org/10.1038/s41598-025-00858-x |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analyzing cost impacts across the entire process of prefabricated building components from design to application
by: Lin Liu, et al.
Published: (2025-03-01) -
Retracted: Optimization Algorithm of Logistics Transportation Cost of Prefabricated Building Components for Project Management
by: Journal of Mathematics
Published: (2023-01-01) -
Deconstruction of a prefabricated concrete building designed for disassembly–cost comparison of deconstruction and demolition
by: Pyry Harsunen, et al.
Published: (2025-01-01) -
Seismic resilience design of prefabricated modular pressurized buildings
by: Zhiwu Ye, et al.
Published: (2025-03-01) -
Design and Analysis of a Novel Prefabricated Foundation for Substation Buildings
by: Weicong Tian, et al.
Published: (2024-12-01)