Equivalent Load Height Determination Method for Shield Tunnel Vertical Load Based on Surrounding Rock Stress Change Rate
[Objective] The applicability and accuracy of the load modes and calculation methods of shield tunnels under existing complex geological conditions are insufficient. It is necessary to determine the equivalent load height value of the shield tunnel vertical load based on the surrounding rock stress...
Saved in:
| Main Authors: | HE Lingen, HUANG Zhonghui, KANG Xiao-yue, LIU Hao, LYU Linhai, YAO Chaofan, WANG Shimin |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-04-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.034.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Reasonable Avoidance Distance of Metro Shield Tunnels under Normal Fault Dislocation
by: ZHANG Yifei, et al.
Published: (2025-06-01) -
Study on Deformation Law and Reinforcement Effects of Metro Shield Tunnel Segments under Loading and Unloading
by: XU Hao, et al.
Published: (2025-03-01) -
Metro Tunnel Shield Construction in Highly Water-rich Karst Strata
by: ZHAO Heming
Published: (2025-03-01) -
Impact of Shield Under-Passing on Existing Tunnel Settlement Considering Construction Factors
by: XUE Ziqian, et al.
Published: (2025-05-01) -
Muck Improvement Technology for Connection Passage of Shield Tunneling Metro Tunnels in Coastal Areas
by: JIANG Peng, et al.
Published: (2025-01-01)