Study on Maximum Scour Depth at River Reach of Shantou Bay Subsea Tunnel Project
This paper studies the flow pattern and riverbed scouring at the river reach of Shantou Bay Subsea Tunnel Project through the river model test and analyzes the maximum scour depth of the riverbed near the project under unfavorable hydrological conditions.The results show that the maximum flood veloc...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2022-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.06.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|