Study on Stability of Small Clearance Shield Tunnel Excavation Face
[Objective] Determine the limit support pressure required to maintain tunnel face stability during the construction of double-line small clearance shield tunnel. [Method] The excavation stability of double-line small clearance shield tunnel is studied by using a combination of numerical simulation,...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Urban Mass Transit Magazine Press
2025-01-01
|
Series: | Chengshi guidao jiaotong yanjiu |
Subjects: | |
Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.018.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|