Analysis of Factors Causing Delays in the Diesel Engine Remanufacturing Process at an Indonesian Company
HeavyEq is an Indonesian company that remanufactures diesel engines for the mining industry. The company experiences delays in the remanufacturing process that lead to a sales backlog. The main purpose of this paper is to identify the root cause of, and propose a solution to, the problem. A fishbone...
Saved in:
| Main Authors: | Erwin Soeseno, Ratih Dyah Kusumastuti |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2018-12-01
|
| Series: | Logistics |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2305-6290/3/1/1 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Enhancing product design for remanufacturing: guidelines and their implementation in integrated remanufacturing systems
by: Magdalena Paul, et al.
Published: (2024-12-01) -
Key Factors Influencing Building Components’ Remanufacturing Strategy: A Comprehensive Literature Review
by: Can Miao Gao, et al.
Published: (2025-03-01) -
STUDY ON OPTIMIZATION OF REMANUFACTURING OF HYDRAULIC SUPPORT COLUMN
by: XIE Miao, et al.
Published: (2020-01-01) -
Optimal Pricing Strategies for Trade-In Programs: A Comparative Theoretical Analysis of No-Price-Commitment and Price-Commitment Models for Remanufacturing
by: Shuting Xu, et al.
Published: (2025-06-01) -
A Pricing and Acquisition Strategy for New and Remanufactured High-Technology Products
by: Liangchuan Zhou, et al.
Published: (2019-02-01)