Scheduling Method of AGV in Spinning Workshop Based on Simulated Annealing Ant Colony Optimization
Focusing on the lack of effective methods for collaborative scheduling of AGV (Automated Guided Vehicle) in ring spinning workshops. Under various constraints covering point demand constraint, path flow constraint, AGV capacity constraint, starting point constraint and variable constraint, an AGV sc...
Saved in:
| Main Authors: | Jinglong Xiong, Yiping Yuan, Yongsheng Chao, Ming Li, Adilanmu Sitahong, Peiyin Mo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Tamkang University Press
2025-06-01
|
| Series: | Journal of Applied Science and Engineering |
| Subjects: | |
| Online Access: | http://jase.tku.edu.tw/articles/jase-202601-29-01-0002 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Robot path planning based on obstacle avoidance optimization and improved ant colony algorithm
by: HE Xingshi, et al.
Published: (2024-06-01) -
Discovering the backbone network with a novel designed ant colony algorithm
by: Fang LYU, et al.
Published: (2020-11-01) -
Design of low-carbon planning model for vehicle path based on adaptive multi-strategy ant colony optimization algorithm
by: Qi Guo, et al.
Published: (2025-01-01) -
Implementing Ant Colony Optimization for Multi-Robot Coordination in Unmanned Ground Robots
by: Muhammad Shafiq, et al.
Published: (2024-12-01) -
Process Optimization for Complex Product Assembly Workshops with AGV Integration via Discrete Event Simulation
by: Hailong Song, et al.
Published: (2025-07-01)