Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine

Coal will still be China’s basic energy for quite a long time. With the increase of mining depth, gas content and pressure also increase. The problems of gas emission and overrun affect the safety and efficient production of coal resource to a certain extent. In this work, the field test of gas drai...

Full description

Saved in:
Bibliographic Details
Main Authors: Enbiao Zhao, Kangnan Li, Xin Yang, Nan Deng
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2021/5545067
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832566088229978112
author Enbiao Zhao
Kangnan Li
Xin Yang
Nan Deng
author_facet Enbiao Zhao
Kangnan Li
Xin Yang
Nan Deng
author_sort Enbiao Zhao
collection DOAJ
description Coal will still be China’s basic energy for quite a long time. With the increase of mining depth, gas content and pressure also increase. The problems of gas emission and overrun affect the safety and efficient production of coal resource to a certain extent. In this work, the field test of gas drainage borehole peeping and trajectory measurement in coal seam of Changling coal mine are carried out. These coal seams include C5b coal seam, upper adjacent C5a coal seam, C6a coal seams, C6c in lower adjacent strata, and C5b coal seam in high-level borehole. The view of gas drainage borehole peeping and trajectory measurement in the working seam, upper adjacent layer, lower adjacent layer, and high position are obtained. It is found that the hole collapses at the position of about 20 m in both adjacent strata and high-level boreholes, and there are a lot of cracks in the high-level boreholes before 12 m. The deviation distance of high-level borehole is large, and the actual vertical deviation of upper adjacent layer is small. Finally, the strategies to prevent the deviation of drilling construction are put forward. It includes four aspects: ensuring the reliability of drilling equipment, reasonably controlling the drilling length, standardizing the drilling, and reasonably selecting the drilling process parameters.
format Article
id doaj-art-a60ff531cc0f4d8bb29d2708fa4c4b92
institution Kabale University
issn 1468-8115
1468-8123
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Geofluids
spelling doaj-art-a60ff531cc0f4d8bb29d2708fa4c4b922025-02-03T01:05:12ZengWileyGeofluids1468-81151468-81232021-01-01202110.1155/2021/55450675545067Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal MineEnbiao Zhao0Kangnan Li1Xin Yang2Nan Deng3Beijing Key Laboratory for Precise Mining of Intergrown Energy and Resources, China University of Mining & Technology (Beijing), Beijing 100083, ChinaBeijing Key Laboratory for Precise Mining of Intergrown Energy and Resources, China University of Mining & Technology (Beijing), Beijing 100083, ChinaSchool of Civil and Resources Engineering, University of Science and Technology Beijing, Beijing 100083, ChinaChina Coal Research Institute, Beijing 100013, ChinaCoal will still be China’s basic energy for quite a long time. With the increase of mining depth, gas content and pressure also increase. The problems of gas emission and overrun affect the safety and efficient production of coal resource to a certain extent. In this work, the field test of gas drainage borehole peeping and trajectory measurement in coal seam of Changling coal mine are carried out. These coal seams include C5b coal seam, upper adjacent C5a coal seam, C6a coal seams, C6c in lower adjacent strata, and C5b coal seam in high-level borehole. The view of gas drainage borehole peeping and trajectory measurement in the working seam, upper adjacent layer, lower adjacent layer, and high position are obtained. It is found that the hole collapses at the position of about 20 m in both adjacent strata and high-level boreholes, and there are a lot of cracks in the high-level boreholes before 12 m. The deviation distance of high-level borehole is large, and the actual vertical deviation of upper adjacent layer is small. Finally, the strategies to prevent the deviation of drilling construction are put forward. It includes four aspects: ensuring the reliability of drilling equipment, reasonably controlling the drilling length, standardizing the drilling, and reasonably selecting the drilling process parameters.http://dx.doi.org/10.1155/2021/5545067
spellingShingle Enbiao Zhao
Kangnan Li
Xin Yang
Nan Deng
Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine
Geofluids
title Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine
title_full Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine
title_fullStr Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine
title_full_unstemmed Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine
title_short Speculum Observation and Trajectory Measurement in Gas Extraction Drilling: A Case Study of Changling Coal Mine
title_sort speculum observation and trajectory measurement in gas extraction drilling a case study of changling coal mine
url http://dx.doi.org/10.1155/2021/5545067
work_keys_str_mv AT enbiaozhao speculumobservationandtrajectorymeasurementingasextractiondrillingacasestudyofchanglingcoalmine
AT kangnanli speculumobservationandtrajectorymeasurementingasextractiondrillingacasestudyofchanglingcoalmine
AT xinyang speculumobservationandtrajectorymeasurementingasextractiondrillingacasestudyofchanglingcoalmine
AT nandeng speculumobservationandtrajectorymeasurementingasextractiondrillingacasestudyofchanglingcoalmine