Estimation of Warm-Up Period Required for Heat Transfer of Heating Device Used for Heat Supply of Field Hospital Operating in Conditions of Extreme Situations
The paper describes experimental investigations of thermal and physical characteristics pertaining to material specimens which has been used for manufacturing the proposed heating device for heat supply system of a field medical hospital. The type of the given material has been determined that is p...
Saved in:
Main Authors: | A. P. Nesenchouk, N. S. Koneva, I. P. Iokova, T. V. Ryzhova, D. I. Shklovchik, M. A. Yarmolchik |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2013-06-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/148 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Estimation of Heating Device‘s Convective Heat Transfer of Heat Supply Systems with Rotational Heat Generator
by: A. P. Nesenchuk, et al.
Published: (2012-12-01) -
On Expediency of Vortex Heat Generator Usage While Realizing Heat Supply for Objects Operating in Emergency Situations
by: A. P. Nesenchuk, et al.
Published: (2012-02-01) -
The “Smart Home” Heat Supply System Based on District Heating with the Utilization of Secondary Energy Resources Using a heat Pump
by: I. L. Iokova, et al.
Published: (2023-10-01) -
INVESTIGATION OF THE POSSIBILITY OF USING A VORTEX HEAT GENERATOR IN HEAT SUPPLY SYSTEMS FOR RESIDENTIAL, INDUSTRIAL AND PUBLIC BUILDINGS
by: I. L. Iokova, et al.
Published: (2018-04-01) -
Resistance of Cast Iron Unified Module Recuperator of Heating Furnaces with High-Temperature Thermal Technologies at Machine Building, Automotive and Tractor Enterprises
by: A. P. Nesenchouk, et al.
Published: (2010-06-01)