Construction Practice of 50t Prestressed Anchor Bars in the Underground Powerhouse of Xiaolangdi Project
Saved in:
| Main Authors: | 黄红万, 李胜春, 颜廷松 |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2004-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47668533&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Corrosion Investigation of Rock Anchors Served over 10 Years in Underground Powerhouse of a Hydropower Station
by: Tao Yin, et al.
Published: (2022-01-01) -
Construction and application of a knowledge graph for the spatial arrangement of underground powerhouses
by: Han Liu, et al.
Published: (2024-09-01) -
Design of Hydraulic Hoists for Eccentric Trunnion Sector Gates of Xiaolangdi Project
by: TENG Xiang, et al.
Published: (2001-01-01) -
Key Factors Affecting the Deformation and Failure of Surrounding Rock Masses in Large-Scale Underground Powerhouses
by: Meng Wang, et al.
Published: (2020-01-01) -
Study of the Vibration Transmission and Path Recognition of an Underground Powerhouse Using Energy Finite Element Method
by: Wei Xu, et al.
Published: (2016-01-01)