Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
The J.P. Magufuli extradosed bridge is currently under construction. This bridge crossing Lake Victoria has an overall length of 3,000 m and a deck width of 28.45 m to accommodate 4 lanes of 3.5 m wide carriageways of vehicular traffic, a shoulder of 2.5 m+2.5 m for emergency parking and vehicle bre...
Saved in:
| Main Author: | Katelula Salum Kaswaga |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Editorial Department of Progress in Prestress Technology, Tongji University
2025-06-01
|
| Series: | 预应力技术 |
| Subjects: | |
| Online Access: | https://ptmc.tongji.edu.cn/yyljs/article/pdf/202502005 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comparison of aluminum and tunnel formwork for high-rise construction
by: K. Ashwin, et al.
Published: (2025-05-01) -
Prediction of Strength and Quality Control of Monolithic Concrete Laying in Structures with Permanent Formwork
by: D. N. Korotkih, et al.
Published: (2024-12-01) -
Design Optimization of an Innovative Instrumental Single-Sided Formwork Supporting System for Retaining Walls Using Physics-Constrained Generative Adversarial Network
by: Wei Liu, et al.
Published: (2025-01-01) -
BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning
by: Van-Hoan Pham, et al.
Published: (2024-12-01) -
Impact of Formwork Materials on Concrete Surface Quality
by: Silvia Trein Heimfarth Dapper, et al.
Published: (2024-10-01)