A robust must‐run capacity identifying approach in power system dispatch considering interdependence with natural gas system
Abstract Identifying the must‐run capacity (MRC) could help to accelerate the unit commitment and assess market power, thus critical for achieving an efficient power system dispatch. However, the existing approaches identify the MRC without considering the ever‐strengthening interdependence between...
Saved in:
Main Authors: | Wenqi Wu, Yunpeng Xiao, Tao Hu, Xiuli Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-12-01
|
Series: | IET Renewable Power Generation |
Subjects: | |
Online Access: | https://doi.org/10.1049/rpg2.13080 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Low‐carbon scheduling model of multi‐virtual power plants based on cooperative game considering failure risks
by: Chen Wu, et al.
Published: (2024-12-01) -
A multi‐level coordinated scheduling strategy for shared energy storage systems under electricity spot and ancillary service markets
by: Qing Dou, et al.
Published: (2024-12-01) -
Optimal PV‐storage capacity planning for rail transit self‐consistent energy systems considering extreme weather conditions
by: Siyu Guo, et al.
Published: (2024-12-01) -
Research on two‐level energy management based on tiered demand response and energy storage systems
by: Danhao Wang, et al.
Published: (2024-12-01) -
Robust network topology for unbalanced active distribution networks with uncertain injections
by: Sanat Kumar Paul, et al.
Published: (2024-12-01)