Analytical Method for Evaluating the Ground Surface Settlement Caused by Tail Void Grouting Pressure in Shield Tunnel Construction
The tail void grouting is a key step in shield tunnel construction and has an important influence on the loading on the surrounding soil and on the resulting settlement. In order to estimate the ground surface settlement caused by tail void grouting pressure in tunnel construction, the loading on th...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2018-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2018/3729143 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|