Optimal Dispatching of Changzhou Water Conservancy Project During Flood Seasons Based on Different Needs

In view of the increasingly prominent contradiction between flood control and water supply and demand in the Changzhou Water Conservancy Project,the current dispatching scheme of the reservoir is analyzed from the aspects of water supply,power generation,shipping,and ecology,and the comprehensive di...

Full description

Saved in:
Bibliographic Details
Main Authors: HUANG Feng, HOU Guibing, LI Yuanyuan, WANG Baohua
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.01.010
Tags: Add Tag
No Tags, Be the first to tag this record!