Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project

The second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longit...

Full description

Saved in:
Bibliographic Details
Main Authors: CHEN Guihua, LI Guangyi, SU Wenliang
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006
Tags: Add Tag
No Tags, Be the first to tag this record!