Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
The hydrodynamic problems associated with the construction of the sea-crossing bridge were proposed. The deep-water approach bridge on both sides of the main bridge of Fuzhou Xiamen high-speed railway adopts the bearingless prestressed concrete integral rigid frame bridge for the first time in the d...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2023-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2023/6357539 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|