Study on cracking mechanism and key parameters of roof in gob-side entry retaining by pre-split blasting roof in deep mine

Based on 7135 working face of Qidong Coal Mine, the cracking mechanism of pre-splitting of gob-side entry retaining by roof cutting and the key parameters of pre-splitting blasting are studied by means of theoretical analysis, numerical simulation, and on-site measurement. Under the same blasting co...

Full description

Saved in:
Bibliographic Details
Main Authors: Xiao Liu, Xueqiu He, Yuntao Liang, Xinzhu Hua, Chen Li
Format: Article
Language:English
Published: SAGE Publishing 2025-01-01
Series:Energy Exploration & Exploitation
Online Access:https://doi.org/10.1177/01445987241269551
Tags: Add Tag
No Tags, Be the first to tag this record!