Optimization of πT Hybrid Structure of 110 kV Power Grid
There are some operational problems of the πT hybrid structure, such as large workload of operation and maintenance, poor flexibility and scalability, which can not meet the increasing demand for power supply reliability. In this paper, the optimization scheme of the πT hybrid structure connection s...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Editorial Department of Power Generation Technology
2020-08-01
|
| Series: | 发电技术 |
| Subjects: | |
| Online Access: | https://www.pgtjournal.com/EN/10.12096/j.2096-4528.pgt.18070 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|