Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects
The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses...
Saved in:
Main Authors: | Ru Liang, Zhaohan Sheng, Xiangyu Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2018/8705134 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependency
by: Junling Zhang, et al.
Published: (2018-01-01) -
Collaboration-Based BIM Model Development Management System for General Contractors in Infrastructure Projects
by: Yu-Cheng Lin, et al.
Published: (2020-01-01) -
Understanding Construction Contractors’ Intention to Undertake Consummate Performance Behaviors in Construction Projects
by: Ling Yan, et al.
Published: (2020-01-01) -
Complexity of Construction Mega Infrastructure Project
by: Changzhi Wu, et al.
Published: (2018-01-01) -
Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects
by: Ru Liang, et al.
Published: (2016-01-01)