Research on the Slurry for Long-Distance Large-Diameter Pipe Jacking in Expansive Soil

When the pipe jacking technology is applied in expansive formation, the soil around the pipe will easily absorb water from the slurry and expand to wrap up the pipe, producing an excessive pipe jacking force. A water-based slurry formula suitable for pipe jacking in expansive soil layer was proposed...

Full description

Saved in:
Bibliographic Details
Main Authors: Xian Yang, Yang Liu, Chao Yang
Format: Article
Language:English
Published: Wiley 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/9040471
Tags: Add Tag
No Tags, Be the first to tag this record!