Trade-off between computation time and solution quality for integrated generation and transmission expansion planning with N-1 security criterion
The generation and transmission (G&T) expansion planning of large-scale systems is usually carried out hierarchically due to the high complexity of the problem. However, this hierarchical plan may be more expensive than a fully integrated (co-optimized) G&T plan that, on the other hand, requ...
Saved in:
Main Authors: | Lucas Y. Okamura, Carmen L.T. Borges, Gianfranco Chicco |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2025-03-01
|
Series: | International Journal of Electrical Power & Energy Systems |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S0142061524006690 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
AC Optimal Power Flow: a Conic Programming relaxation and an iterative MILP scheme for Global Optimization
by: Oustry, Antoine
Published: (2022-11-01) -
Optimizing the Supply Chain for Recycling Electric Vehicle NMC Batteries
by: Fransisca Indraningsih Kasy, et al.
Published: (2025-01-01) -
Optimum design of wind turbine foundation according to rebar detailing
by: Italo Linhares Salomão, et al.
Published: (2025-01-01) -
Adaptive Cut Selection in Mixed-Integer Linear Programming
by: Turner, Mark, et al.
Published: (2023-07-01) -
A Customized Local Energy Trading Approach Using a Comprehensive Set of Performance Indices
by: Smitali Patnaik, et al.
Published: (2025-01-01)