A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
The postconstruction settlement of the bridge approach is usually uneven, which could create a bump in the roadway. Indeed, this is a typical situation at the end of the bridge approach and requires a solution. One of the main causes of postconstruction settlement is the creep of soil. This paper is...
Saved in:
Main Authors: | Fei Zhou, Tangdai Xia, Bingqi Yu, Fan Xia, Fan Yu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2021/4029439 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Practical Design Method to Determine the Replacement Time of Light Embankment
by: Fei Zhou, et al.
Published: (2022-01-01) -
Research on Mechanical Response of Pavement Structure to Differential Settlement of Subgrade on Highway Widening
by: Quanjun Shen, et al.
Published: (2021-01-01) -
Study on Prediction Method for Postconstruction Settlement of Loess Fill Foundation in Northern Shaanxi, China
by: Kui Liu, et al.
Published: (2020-01-01) -
Foundation Treatment Assessment and Postconstruction Settlement Prediction of a Loess High Fill Embankment: A Case Study
by: Caihui Zhu, et al.
Published: (2020-01-01) -
Analysis of the Embankment Settlement on Soft Soil Subgrade with a Cement Mixed Pile
by: Liang Yang, et al.
Published: (2021-01-01)