A Practical Design Method for Reducing Postconstruction Settlement of Highway Subgrade Induced by Soil Creep
The postconstruction settlement of the bridge approach is usually uneven, which could create a bump in the roadway. Indeed, this is a typical situation at the end of the bridge approach and requires a solution. One of the main causes of postconstruction settlement is the creep of soil. This paper is...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2021/4029439 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|