Formation Mechanism and the Height of the Water-Conducting Fractured Zone Induced by Middle Deep Coal Seam Mining in a Sandy Region: A Case Study from the Xiaobaodang Coal Mine

The height of the water-conducting fractured zone (WCFZ) is a basic parameter related to water protection in coal mines and is also crucial for aquifer protection and mine safety. In order to accurately detect the height and shape and reveal the formation mechanism of the WCFZ, which is caused by mi...

Full description

Saved in:
Bibliographic Details
Main Authors: Xiaoshen Xie, Enke Hou, Shuangming Wang, Xueyang Sun, Pengfei Hou, Shibin Wang, Yongli Xie, Yongan Huang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6684202
Tags: Add Tag
No Tags, Be the first to tag this record!