Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum

[Objective] During the tunneling process of the EPB (earth pressure balance shield machine)/TBM (full-face hard rock tunnel boring machine) dual-mode shield tunneling machine, problems such as excessive wear of the cutting tools and improper setting of tunneling parameters are prone to cause acciden...

Full description

Saved in:
Bibliographic Details
Main Author: DUAN Yueqiang
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-01-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.043.html
Tags: Add Tag
No Tags, Be the first to tag this record!