EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE
Background: PT. X implements a daily trip method that takes ±1,5 hours to arrive at the offshore platforms. Travel time that’s too long can cause fatigue. Purpose: Analyzing the effect of a daily trip system on PT. X contractor worker fatigue at offshore site. Method: This research was conducted at...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Airlangga
2021-11-01
|
Series: | Journal of Vocational Health Studies |
Subjects: | |
Online Access: | https://e-journal.unair.ac.id/JVHS/article/view/29615 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832573695731695616 |
---|---|
author | Desi Nuraini Doni Hikmat Ramdhan |
author_facet | Desi Nuraini Doni Hikmat Ramdhan |
author_sort | Desi Nuraini |
collection | DOAJ |
description | Background: PT. X implements a daily trip method that takes ±1,5 hours to arrive at the offshore platforms. Travel time that’s too long can cause fatigue. Purpose: Analyzing the effect of a daily trip system on PT. X contractor worker fatigue at offshore site. Method: This research was conducted at one of PT. X’s offshore Gresik Sites in June 2021 used Fatigue Assessment Scale (FAS) questionnaire with observational analytics method and cross-sectional study design. Research samples were taken from the population of 153 construction workers PT. X at offshore site. The data obtained were analyzed using quantitative approach, data analysis used univariate analysis and bivariate analysis, chi-square statistical test with significance value or confidence interval was 95% and error interval was 5% (CI = 95% and α = 0.05). Result: PT. X Contractor workers at the offshore site had 85 workers (55.56%) that get fatigue. Statistical analysis test showed there was no significant relationship between a daily trip system with fatigue on PT. X Contractor workers at the offshore site (p-value = 0.140). Factors that affect fatigue on PT. X Contractor workers at the offshore site were age, body mass index, and workload (p-value successive were 0.047, 0.014, and 0.001). Conclusion: A daily trip system has no effect with fatigue on PT. X contractor worker at the offshore site, recommended for the contractor to improve the BMI and manage the workload so that its more evenly distributed. |
format | Article |
id | doaj-art-64f2b821fa894f22adc403c7269b2954 |
institution | Kabale University |
issn | 2580-7161 2580-717X |
language | English |
publishDate | 2021-11-01 |
publisher | Universitas Airlangga |
record_format | Article |
series | Journal of Vocational Health Studies |
spelling | doaj-art-64f2b821fa894f22adc403c7269b29542025-02-02T03:15:53ZengUniversitas AirlanggaJournal of Vocational Health Studies2580-71612580-717X2021-11-0152737910.20473/jvhs.V5.I2.2021.73-7914034EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITEDesi Nuraini0Doni Hikmat Ramdhan1Universitas Indonesia - UI, DepokUniversitas Indonesia - UI, DepokBackground: PT. X implements a daily trip method that takes ±1,5 hours to arrive at the offshore platforms. Travel time that’s too long can cause fatigue. Purpose: Analyzing the effect of a daily trip system on PT. X contractor worker fatigue at offshore site. Method: This research was conducted at one of PT. X’s offshore Gresik Sites in June 2021 used Fatigue Assessment Scale (FAS) questionnaire with observational analytics method and cross-sectional study design. Research samples were taken from the population of 153 construction workers PT. X at offshore site. The data obtained were analyzed using quantitative approach, data analysis used univariate analysis and bivariate analysis, chi-square statistical test with significance value or confidence interval was 95% and error interval was 5% (CI = 95% and α = 0.05). Result: PT. X Contractor workers at the offshore site had 85 workers (55.56%) that get fatigue. Statistical analysis test showed there was no significant relationship between a daily trip system with fatigue on PT. X Contractor workers at the offshore site (p-value = 0.140). Factors that affect fatigue on PT. X Contractor workers at the offshore site were age, body mass index, and workload (p-value successive were 0.047, 0.014, and 0.001). Conclusion: A daily trip system has no effect with fatigue on PT. X contractor worker at the offshore site, recommended for the contractor to improve the BMI and manage the workload so that its more evenly distributed.https://e-journal.unair.ac.id/JVHS/article/view/29615daily tripfatiguecontractor offshore |
spellingShingle | Desi Nuraini Doni Hikmat Ramdhan EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE Journal of Vocational Health Studies daily trip fatigue contractor offshore |
title | EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE |
title_full | EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE |
title_fullStr | EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE |
title_full_unstemmed | EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE |
title_short | EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE |
title_sort | effect of daily trip system on pt x contractor worker fatigue at offshore site |
topic | daily trip fatigue contractor offshore |
url | https://e-journal.unair.ac.id/JVHS/article/view/29615 |
work_keys_str_mv | AT desinuraini effectofdailytripsystemonptxcontractorworkerfatigueatoffshoresite AT donihikmatramdhan effectofdailytripsystemonptxcontractorworkerfatigueatoffshoresite |