EFFECT OF DAILY TRIP SYSTEM ON PT. X CONTRACTOR WORKER FATIGUE AT OFFSHORE SITE
Background: PT. X implements a daily trip method that takes ±1,5 hours to arrive at the offshore platforms. Travel time that’s too long can cause fatigue. Purpose: Analyzing the effect of a daily trip system on PT. X contractor worker fatigue at offshore site. Method: This research was conducted at...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Airlangga
2021-11-01
|
Series: | Journal of Vocational Health Studies |
Subjects: | |
Online Access: | https://e-journal.unair.ac.id/JVHS/article/view/29615 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|