Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology
In this paper, the single-machine scheduling problem is studied by simultaneously considering due-date assignment and group technology (GT). The objective is to determine the optimal sequence of groups and jobs within groups and optimal due-date assignment to minimize the weighted sum of the absolut...
Saved in:
Main Authors: | Li-Yan Wang, Mengqi Liu, Ji-Bo Wang, Yuan-Yuan Lu, Wei-Wei Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2021/6656261 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Scheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment
by: Long Wan
Published: (2014-01-01) -
Optimization for Due-Window Assignment Scheduling with Position-Dependent Weights
by: Li-Yan Wang, et al.
Published: (2020-01-01) -
Due-Window Assignment Scheduling with Variable Job Processing Times
by: Yu-Bin Wu, et al.
Published: (2015-01-01) -
Online Scheduling on a Single Machine with Grouped Processing Times
by: Qijia Liu, et al.
Published: (2015-01-01) -
Solution Algorithms for Single-Machine Group Scheduling with Learning Effect and Convex Resource Allocation
by: Wanlei Wang, et al.
Published: (2021-01-01)