Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology
In this paper, the single-machine scheduling problem is studied by simultaneously considering due-date assignment and group technology (GT). The objective is to determine the optimal sequence of groups and jobs within groups and optimal due-date assignment to minimize the weighted sum of the absolut...
Saved in:
Main Authors: | Li-Yan Wang, Mengqi Liu, Ji-Bo Wang, Yuan-Yuan Lu, Wei-Wei Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2021/6656261 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization for Due-Window Assignment Scheduling with Position-Dependent Weights
by: Li-Yan Wang, et al.
Published: (2020-01-01) -
Due-Window Assignment Scheduling with Variable Job Processing Times
by: Yu-Bin Wu, et al.
Published: (2015-01-01) -
Due-Window Assignment and Resource Allocation Scheduling with Truncated Learning Effect and Position-Dependent Weights
by: Shan-Shan Lin
Published: (2020-01-01) -
Scheduling on a Single Machine and Parallel Machines with Batch Deliveries and Potential Disruption
by: Hua Gong, et al.
Published: (2020-01-01) -
Nature-Inspired Metaheuristics for Two-Agent Scheduling with Due Date and Release Time
by: Hongwei Li, et al.
Published: (2020-01-01)